<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">13</journal-id>
      <journal-title-group>
        <journal-title>《论证与研究》</journal-title>
      </journal-title-group>
      <issn>ISSN:3079-9236（原2705-0858）</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="publisher-id">29495</article-id>
      <title-group>
        <article-title>全过程造价管理在建筑工程项目中的应用与优化研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>刘佳1 刘嘉静2 张轶翔3 1.柳河县圣水镇综合服务中心</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>2.长春建筑学院</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>3.吉林省永晟燃气安装开发有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>3</month>
      </pub-date>
      <issue>3</issue>
      <abstract>
        <p>在“乡村振兴”战略持续深化的背景下，农村道路、边沟、路灯等基础设施的投资强度逐年加大，但“概算超估
算、预算超概算、结算超预算”的顽疾依旧突出。本文以镇政府为建设单位，从宏观层面探讨全过程造价管理在农村基础设
施项目中的适用性与优化路径。文章将项目全周期划分为立项决策、设计、招标、施工、竣工结（决）算、绩效评价六个阶
段，剖析各阶段造价失控的共性机理，提出“制度—技术—组织—生态”四位一体的优化框架：制度层面建立“镇级项目造
价负面清单”与动态概算调整机制；技术层面推广“标准图集＋造价指标＋BIM 轻量化”组合工具；组织层面打造“镇级造
价联络官＋村级义务监督员”双轨网络；生态层面引入“银行监管＋保险共保＋运维打包”长效机制，实现从“一次性造价
控制”向“全寿命周期成本最优”转变。
关键词：全过程造价管理；农村基础设施；镇政府；水泥路；沥青路；全寿命周期</p>