<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">27</journal-id>
      <journal-title-group>
        <journal-title>《机械工程》</journal-title>
        <abbrev-journal-title>Mechanical engineering</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2661-3530(P)/2661-3549(O)</issn>
      <publisher>
        <publisher-name>环宇科学出版社;华文国际出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="publisher-id">10483</article-id>
      <title-group>
        <article-title>Study on deformation behavior of deep foundation pit supported by pile-anchor in soil-rock dual stratum</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Jinhua Lin1* （Xiamen Rail Transit Group Co.Ltd.Xiamen 361000</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>China）</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>1</month>
      </pub-date>
      <issue>1</issue>
      <abstract>
        <p>To analyze the excavation deformation low of pile-anchor combined support structure foundation pit in
soil-rock dual stratum with large geological fluctuations under complex working conditions，in light of the measured data
of an open-cut foundation pit engineeringt in Xiamen ，the pile top displacement，pile lateral displacement，surface
settlement outside the pit and anchor cable internal force were studied.The findings reveal that：According to the
difference of geology and the rock-socketed of the pile bottom，the lateral displacement of pile body can be divided
into“cantilever shape”，“cantilever shape + kicking shape” and “translational shape”.The maximum lateral
displacement value of pile body is between 0.34%H and 0.58%H，and the mean value is 0.48%H.The surface settlement
pattern shows a concave - shaped distribution，and the positiont with the largest settlement is approximately 0.33H from
the edge of the pit，and the maximum surface settlement δvm is between 0.5δhm and 2.5δhm.The overall ability of
pile-anchor supporting structure to resist the deformation of foundation pit is insufficient，and the deformation of
foundation pit will increase sharply when the prestressing force is not stretched in time.The high pressure rotary grouting
after the retaining pile will aggravate the deformation of the foundation pit.In similar projects，it is suggested to take
reinforcement approaches with less disturbance to the soil，such as MJS grouting reinforcement</p>
      </abstract>
    </article-meta>
  </front>
</article>
