<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">27</journal-id>
      <journal-title-group>
        <journal-title>《机械工程》</journal-title>
        <abbrev-journal-title>Mechanical engineering</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2661-3530(P)/2661-3549(O)</issn>
      <publisher>
        <publisher-name>环宇科学出版社;华文国际出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2661-3549-07-05-0344</article-id>
      <article-id pub-id-type="publisher-id">15459</article-id>
      <title-group>
        <article-title>建筑工程进度控制关键措施分析</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>高会艳 （曲靖市麒麟区沿江街道农业农村发展服务中心 云南曲靖 655000）</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>5</month>
      </pub-date>
      <issue>5</issue>
      <abstract>
        <p>本文围绕建筑工程进度控制展开研究，系统剖析人为、技术、资源及外部环境等关键影响因素。针对人为因素中的人员协调问题、技术因 素的工艺瓶颈、资源调配不足及外部环境的不确定性，通过理论与实践结合，提出科学应对策略。如以合理 s 制定进度计划优化时间安排，通过组 织架构调整提升管理效能，借助资源动态调配保障施工需求，依靠技术创新突破工艺难题。同时，构建包含实施步骤、监控体系及偏差处理的全流 程控制框架，旨在为建筑工程进度管理提供系统性解决方案，助力工程按时、高质量竣工，有效提升项目整体效益与管理水平。</p>