<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">27</journal-id>
      <journal-title-group>
        <journal-title>《机械工程》</journal-title>
        <abbrev-journal-title>Mechanical engineering</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2661-3530(P)/2661-3549(O)</issn>
      <publisher>
        <publisher-name>环宇科学出版社;华文国际出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/jxgc2661-3530-202509028</article-id>
      <article-id pub-id-type="publisher-id">20833</article-id>
      <title-group>
        <article-title>电气工程施工管理与成本控制策略</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>马国航 （广东维能工程设备有限公司 广东珠海 519000）</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>9</month>
      </pub-date>
      <issue>9</issue>
      <abstract>
        <p>随着我国建筑行业发展，电气工程作为建筑工程关键部分，其施工管理水平和成本控制效果影响工程项目质量、进度和效益。本 文先分析当前电气工程施工管理存在施工方案未优化、技术交底不到位、现场协调机制不健全、安全管理有隐患等问题，以及成本控制面 临人工成本上涨、材料价格波动、施工浪费、预算编制不合理等挑战。在此基础上，结合施工特点和管理需求，从施工管理和成本控制两 维度提出策略。施工管理方面，强调优化施工组织设计与方案、强化技术与质量管控、建立现场协调沟通机制、落实安全生产责任制；成 本控制方面，阐述加强成本预算科学性与动态调整、推行材料与设备精细化管理、优化人力资源配置、运用先进技术提升成本控制水平、 强化成本核算与监督等措施，为施工企业提升管理效能、降低成本、实现目标提供参考和指导。</p>
      </abstract>