<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7310-22</article-id>
      <article-id pub-id-type="publisher-id">17194</article-id>
      <title-group>
        <article-title>公用工程设备建设中的施工顺序与交叉作业管理</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>蓝 涛 曹林峰</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>10</month>
      </pub-date>
      <issue>10</issue>
      <abstract>
        <p>当前，公用工程设备建设对于基础设施的完善与城市发展尤为关键。对其施工顺序和交叉作业的有效管理成为确保工程质量和进
度的重要环节。研究通过分析众多公用工程项目的施工案例，着重探讨了施工顺序的科学制定与交叉作业的精细调控。研究表明，合理的
施工顺序安排可以明显缩短项目周期，减少资源浪费；通过实行动态交叉作业管理策略，尤其在多专业交叉作业频繁的项目中，能够有效
避免作业冲突，提高作业效率。此外，本研究还构建了一个交叉作业管理框架，该框架结合现场实际情况，可以实时调整作业计划，确保
项目顺利推进。这项研究不仅对公用工程项目管理提供了实际的操作建议，也为今后相关研究提供了理论依据和数据支持。研究意义在于
更好地理解和优化公用工程施工中的关键管理环节，为工程项目管理实践提供了有力的策略支持，从而推动公用设施建设的高效与可持续
发展。
关键词：公用工程设备建设；施工顺序；交叉作业管理；工程项目管理；作业效率</p>