<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7310-120</article-id>
      <article-id pub-id-type="publisher-id">17301</article-id>
      <title-group>
        <article-title>重大公共卫生事件对工程停缓建造价风险的补偿机制研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>杨莹莹</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>10</month>
      </pub-date>
      <issue>10</issue>
      <abstract>
        <p>本文以重大公共卫生事件为背景，系统分析其对工程停缓建造成的造价风险，并探讨补偿机制的构建路径。通过文献梳理与案例
分析，研究发现：公共卫生事件导致工程停缓建的直接成本包括人员窝工费、设备闲置费、材料损耗费等，间接成本涉及资金占用成本、
预期利润损失等。当前补偿机制存在标准不统一、程序繁琐、法律适用争议等问题。基于风险分担原则，本文提出分层补偿模型，建议从
直接损失补偿、间接损失补偿、动态调整机制三方面完善补偿机制，并提出政策建议以推动机制落地。研究结论对优化工程风险管理、保
障各方权益具有理论价值与实践意义。
关键词：重大公共卫生事件；工程停缓建造价风险；补偿机制；风险分担</p>
      </abstract>