<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-250714054</article-id>
      <article-id pub-id-type="publisher-id">20194</article-id>
      <title-group>
        <article-title>浅谈凝汽器钛管胶球管道更换设备的研究与应用</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>马吉庆 刘 贝 黄汉华</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>14</month>
      </pub-date>
      <issue>14</issue>
      <abstract>
        <p>在核电站等场所中存在有大量的垂直安置的大口径输液管道，在长周期的工作过程中由于各种各样的原因当这些管道中的某一段
需要被更换时，更换操作都是一项耗时耗力且具有一定危险性的工作。一方面待更换的管段本身体积大质量大，必须通过重型装备进行操
作，且由于管道整体处于竖直状态，其中的一段在拆除后其上方管道将悬空，因此需要事先将上方管道固定。另一方面类似核电站等特殊
场所中，各种大体积的重型设备多，对空间资源的需求量大，因此可利用空间较狭小，进一步提高了更换难度。目前操作方式主要采用电
动葫芦进行吊装，过程中不可控因素较多，效率低下，且难以保证绝对安全。采用专用装置进行操作，装置安装固定于地面，主支撑架用
于承载上方管道，并对橡胶膨胀节进行压缩，为待更换的管段提供必要的更换空间；平移装置用于顶升并托举更换管段，水平移动将其移
出原安装位置，此步骤反向操作则为新管段安装步骤。整个过程实现自动化，快速便捷，大大减少人力资源的消耗，可以显著提高效率，
满足高效、安全的更换需求。
关键词：凝汽器；管道；顶升平移</p>