<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25072184</article-id>
      <article-id pub-id-type="publisher-id">24400</article-id>
      <title-group>
        <article-title>UHPC 连接分节段预制拼装桥墩施工技术</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>孔德富 上海市政工程设计研究总院（集团）有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>21</month>
      </pub-date>
      <issue>21</issue>
      <abstract>
        <p>乌鲁木齐东进场高架道路 EPC 总承包项目立交区域超高、超重墩柱施工中，针对现场施工需求研发了超高双节大型墩柱施工成套
技术。该技术核心为在上下节墩柱顶底预留钢筋，拼装后采用 UHPC 环向湿接头连接替代传统钢筋连接，有效克服了双节预制墩柱拼装截
面压应力、抗折抗剪性能不足及上下节段拼装精度控制困难等施工痛点。结合上节预制墩柱安装工序，重点研究其施工技术关键点及质量
薄弱环节，明确预制上节墩柱吊装辅助装配式工装架安装、上节墩柱吊装、环向湿接头模板安装、UHPC 灌注及养护等工序为质量控制核
心，同时也是上节墩柱安装施工的技术关键。本文详细阐述该技术的应用要点，为同类超高、超重墩柱预制拼装施工提供技术参考。
关键词：桥梁墩柱；预制拼装；UHPC 连接；装配式工装架；高墩柱施工</p>