<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25072239</article-id>
      <article-id pub-id-type="publisher-id">25471</article-id>
      <title-group>
        <article-title>征地拆迁滞后对工程施工进度的影响及管理优化</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>黄贤俊 广州市花都区交通事务管理中心</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>22</month>
      </pub-date>
      <issue>22</issue>
      <abstract>
        <p>征地拆迁作为工程建设的前置核心环节，其推进效率直接决定施工进度的可控性。当前我国公路、市政等工程普遍面临征地拆迁
滞后问题，引发工期延误、成本超支、施工组织紊乱等连锁反应，严重制约工程高质量建设。本文以多类工程实践为依托，系统分析征地
拆迁滞后对施工计划、资源配置、工序衔接及质量安全的具体影响，深挖政策标准、协同机制、利益协调、执行管控等层面的滞后根源，
结合典型案例提出“政策完善-协同赋能-精准管控-风险预判”四位一体管理优化策略。研究表明，科学的优化方案可缩短征拆滞后引发
的工期损失 30%以上，有效降低资源浪费，为工程施工进度管控提供理论支撑与实操参考。
关键词：征地拆迁；滞后影响；施工进度；资源配置；管理优化</p>