<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25072242</article-id>
      <article-id pub-id-type="publisher-id">25474</article-id>
      <title-group>
        <article-title>市政工程施工成本目标动态控制策略</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>陈 亮 湖北顺和建设工程有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>22</month>
      </pub-date>
      <issue>22</issue>
      <abstract>
        <p>市政工程项目具有投资规模大、建设周期长、现场工况复杂等显著特点，施工阶段的成本管控直接关系到财政资金的使用效能与
项目整体效益。依托目标控制理论，结合市政工程施工技术要点与精细化管理理念，本文从目标分解、动态监控、偏差纠偏及保障机制四
个维度构建成本动态控制体系，以湖北省道路改造、综合管廊两类典型项目为实践载体，深入剖析该体系的实际应用效果并提出优化路径，
为市政施工企业提升成本管控能力、防范“三超”风险提供实践参考，助力实现项目经济效益与社会效益的协同提升。
关键词：市政工程；施工成本管控；目标控制理论；动态管控；精细化管控；湖北工程案例</p>