<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080146</article-id>
      <article-id pub-id-type="publisher-id">25582</article-id>
      <title-group>
        <article-title>浅谈地下室管线综合支架施工技术</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>陈阿彬 成 苹 朱新浩 张成若 车 淼 中国建筑第七工程局有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>1</month>
      </pub-date>
      <issue>1</issue>
      <abstract>
        <p>随着地下空间开发的集约化发展，传统管线支架施工模式面临定位精度低、工序冲突多、运维监测难等问题。本文以福州某机场
扩建工程 T2 航站楼为工程载体，针对地下室管线综合支架施工中的三维定位预埋、模块化装配式安装、智能应力监测等关键技术展开研
究。通过 BIM 协同深化设计优化管线排布，采用热浸镀锌钢构支架体系，配合光纤光栅传感技术，实现施工效率提升 40%，材料损耗降
低 25%，为同类工程提供技术参考。
关键词：管线综合支架；BIM 协同；装配式施工；应力监测</p>