<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-0803095</article-id>
      <article-id pub-id-type="publisher-id">27466</article-id>
      <title-group>
        <article-title>G553 线南昏河大桥危桥重建工程 T 梁预制与架设施工 技术研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>钟权武 云南交通基建工程监理有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>3</month>
      </pub-date>
      <issue>3</issue>
      <abstract>
        <p>危桥重建是公路基础设施养护升级的重要举措，预应力后张法 T 梁因受力合理、施工便捷的特点，在二级公路危桥重建中应用广
泛。本文结合预应力 T 梁施工技术研究，以 G553 线南昏河大桥危桥重建工程为案例，分析梁场建设、预制施工、运输架设的核心技术要
点，提出质量控制与安全防护的通用措施，为同类工程提供技术参考。实践表明，针对性的工艺优化与全过程管控，能有效保障 T 梁施工
质量与安全，提升危桥重建工程施工效率。
关键词：危桥重建；预应力 T 梁；梁场建设；预制施工；架桥机架设；质量控制</p>