        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080410-55</article-id>
      <article-id pub-id-type="publisher-id">28809</article-id>
      <title-group>
        <article-title>穿越溶洞段公路隧道施工技术分析</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王聪伟 王 哲 重庆交通建设(集团)有限责任公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>5</month>
      </pub-date>
      <issue>5</issue>
      <abstract>
        <p>穿越溶洞段公路隧道施工受岩溶发育、地下水活动、围岩破碎和空腔分布影响，施工风险明显高于普通围岩段。若前方溶洞位置、
规模、充填状态及含水情况掌握不足，开挖过程中容易出现突水突泥、拱部掉块、掌子面失稳和支护变形等问题。本文围绕溶洞段施工特
点，重点分析超前探测、预支护加固、分类处治、三台阶短进尺开挖、初期支护闭合成环及二次衬砌防排水等技术要点，以期提高溶洞段
隧道施工结构稳定性。
关键词：穿越溶洞段；公路隧道；施工技术</p>