<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080410-57</article-id>
      <article-id pub-id-type="publisher-id">28811</article-id>
      <title-group>
        <article-title>EPC 模式下园林绿化工程的施工界面管理与成本控制研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王 婧 扬州市勘测设计研究院有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>5</month>
      </pub-date>
      <issue>5</issue>
      <abstract>
        <p>园林工程精品化建设推进过程中，EPC 总承包模式凭借一体化集成优势，成为园林景观项目主流建设模式。园林绿化工程兼具工
程属性与景观艺术属性，施工工序交叉密集、现场工况多变、苗木养护不确定性较强，施工界面交错复杂，极易引发施工返工与资源浪费。
现阶段园林 EPC 项目普遍存在界面划分不清晰、专业协同不足、成本管控精细化程度偏低等问题，容易出现工期延误与造价超支情况，制
约行业精细化转型发展。本文结合园林绿化工程独有施工特征，分析施工界面管理与成本控制的内在关联，梳理项目建设过程中的管控短
板，提出贴合现场实操的优化策略，为同类园林 EPC 项目提质降本、规范管理提供实践参考。
关键词：EPC 模式；园林绿化工程；施工界面；界面管理；成本控制；精细化管理</p>