<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080410-78</article-id>
      <article-id pub-id-type="publisher-id">28832</article-id>
      <title-group>
        <article-title>工程项目施工生产进度影响因素及管控策略</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>张 亮 上海建工集团股份有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>5</month>
      </pub-date>
      <issue>5</issue>
      <abstract>
        <p>工程项目施工生产进度直接影响工程的成本、质量与安全效益。异形超高层幕墙工程对于施工具有特殊要求，其往往造型复杂，
施工的精度要求和交叉作业多，由此形成的施工管控难度也高于常规的工程项目。基于此，本文以西湖大学建设工程三期 E9 标志塔幕墙工
程作为案例，探究分析工程项目施工生产进度影响因素并提出几点管控策略，期望能够为破解工程项目施工生产管控难题，促进施工生产
进度正常开展提供一些参考借鉴。
关键词：幕墙工程；施工进度；影响因素；管控策略；异形建筑</p>