<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080410-97</article-id>
      <article-id pub-id-type="publisher-id">28851</article-id>
      <title-group>
        <article-title>EPC 总承包模式下建筑工程造价管理要点</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>张涌琛 河北建设集团股份有限公司 河北保定 071000</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>5</month>
      </pub-date>
      <issue>5</issue>
      <abstract>
        <p>在建筑行业转型升级的大环境下，EPC 总承包模式因具有设计、采购、施工一体化的优势，成为各种建筑项目的主要承包模式。
此种模式下造价管理贯穿于项目的整个生命周期中，直接影响项目的投资效益。目前，很多建筑企业对于 EPC 总承包模式下造价的管理还
存在着许多问题，例如设计和造价相脱离、采购成本控制不力、施工阶段变更无序、竣工结算效率低等等，从而造成项目的投资超支、效
益受损。本文以 EPC 总承包模式的主要特点为依托，确定造价管理的四个主要原则，全面剖析前期决策和设计、采购、施工、竣工这四个
重要阶段的造价管理内容，分析各个阶段的管控重点及实施途径，并对管控过程中出现的各种问题给出相应的解决办法。
关键词：EPC 总承包模式；建筑工程；造价管理；全生命周期；</p>