<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080414-23</article-id>
      <article-id pub-id-type="publisher-id">29334</article-id>
      <title-group>
        <article-title>复杂地层深基坑逆作法地下连续墙施工技术</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>刘志强 陆 超 郭 斌 杜鹏飞 张建广 周冰洋 中国建筑第七工程局有限公司 河南郑州 450000</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>6</month>
      </pub-date>
      <issue>6</issue>
      <abstract>
        <p>本文以某城市综合体深基坑工程为研究对象，结合场地内溶洞、粉土、淤泥土交错分布及紧邻地铁车站施工环境等特点，对半逆
作法地下连续墙施工关键问题进行分析，本文主要对工程概况、地质条件进行了详细的介绍，并且总结出该类工程在成槽稳定、垂直度控
制、接头止水、钢筋笼吊装、周边保护等方面施工难点，还对成槽施工、泥浆护壁与清底、接头处理、混凝土防绕流、预埋件制作与钢筋
笼吊装等技术要点进行了归纳。实践表明，在复杂地层中采用分段控制、参数调整、过程监测三者相结合的施工技术措施，可以较好地控
制槽壁坍塌、接头渗漏、结构偏位等质量风险，对类似深基坑逆作法地下连续墙施工有一定的借鉴意义。
关键词：复杂地层；深基坑逆作法；地下连续墙施工技术</p>