<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080414-39</article-id>
      <article-id pub-id-type="publisher-id">29350</article-id>
      <title-group>
        <article-title>继电保护安装调试阶段监理质量管控研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>赵永林 云南凯诚达工程管理咨询有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>6</month>
      </pub-date>
      <issue>6</issue>
      <abstract>
        <p>继电保护作为电力系统故障切除、电网安全稳定运行的核心二次设备，其安装与调试施工质量直接决定变电站投运可靠性。现阶
段变电站工程建设提速，继电保护设备智能化、集成化程度持续提升，安装调试工序繁杂、交叉作业多，现场监理管控面临新难点。本文
立足继电保护现场安装、分系统调试、整组传动全流程，梳理安装调试期间常见施工质量缺陷，从事前预控、事中过程监理、事后验收管
控三个维度构建监理管控体系，细化各工序监理工作要点，针对性提出质量管控优化举措。研究表明，全流程闭环监理模式可有效规避接
线失误、定值偏差、传动试验不合格等质量隐患，提升继电保护工程施工质量，保障变电站安全投产与电网平稳运行，可为同类变电工程
继电保护监理工作提供实践参考。
关键词：继电保护；安装调试；工程监理；质量管控；变电站</p>