<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080414-66</article-id>
      <article-id pub-id-type="publisher-id">29377</article-id>
      <title-group>
        <article-title>施工现场劳务班组资源调配延迟及弹性用工与智能排班 决策模型设计</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>李 静 四川中焱建筑工程有限公司 四川成都 610000</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>6</month>
      </pub-date>
      <issue>6</issue>
      <abstract>
        <p>建筑工程施工现场作业模式持续迭代，劳务班组作为一线生产核心单元，其资源流转效率、用工组织形式、排班体系架构直接影
响项目工期、成本、质量与安全四大核心指标。本文结合隧道工程机械化集群作业、住宅工程劳务直管模式、建筑现场班组安全管理三类
工程实践场景，剖析劳务班组资源调配延迟产生的多维诱因，结合建筑行业用工特征构建弹性用工实施体系，依托现场作业工序、人员配
置、设备联动数据设计智能排班决策模型。结合实际工程项目 42 个月工期、IV-V 级围岩隧道施工、住宅项目全周期成本管控等实测数据，
验证模型在压缩调配滞空时间、优化人力配置、降低综合运营成本方面的实际效能。研究结果表明，智能排班决策模型可将劳务班组工序
循环等待时长最高缩减 2h，班组人力冗余配置率下降 12%以上，配合弹性用工机制能够有效化解传统劳务组织模式下人员固化、调配滞后、
安全管控薄弱等痛点，可为建筑施工现场劳务资源精细化管理提供理论支撑与实操方案。
关键词：施工现场；劳务班组；资源调配延迟；弹性用工</p>