<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-06-11-2241-6</article-id>
      <article-id pub-id-type="publisher-id">5266</article-id>
      <title-group>
        <article-title>建筑工程项目进度计划与控制研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>杨立亮 （江苏东南工程咨询有限公司 江苏南京 210018）</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2024</year>
        <month>12</month>
      </pub-date>
      <issue>12</issue>
      <abstract>
        <p>本文针对建筑工程项目中的进度计划编制与控制策略展开全面分析与探讨。文章从项目管理的角度出发，系统性地梳理了建筑工
程项目进度管理的重要性，明确了进度计划编制的核心目标。通过分析影响工程项目进度的主要因素，提出了多种科学的进度编制方法，
如关键路径法（CPM）、计划评审技术（PERT）、甘特图法等，以制定切实可行的进度计划。此外，本文提出了一系列进度控制策略，如
动态监控、风险预防、资源优化及信息化技术应用等，有效应对项目实施过程中可能出现的风险与变更情况。合理的进度计划与科学的控
制策略能够有效缩短工期、降低项目成本，同时提高工程质量与管理效率。
关键词：建筑工程；项目进度计划；控制策略；进度管理</p>