<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-06-2238-91</article-id>
      <article-id pub-id-type="publisher-id">6447</article-id>
      <title-group>
        <article-title>建设工程总包合同资金回收风险及应对措施浅析</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>卢桂花 （成都建工第七建筑工程有限公司 四川成都 610000）</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2024</year>
        <month>13</month>
      </pub-date>
      <issue>13</issue>
      <abstract>
        <p>受国家宏观政策调整、房地产投资收紧等多重负面影响，建筑市场竞争激烈、房产购买力不足，导致建设投资方尤其是部分开发
商资金链断裂，甚至出现爆雷，施工单位面临的市场风险也随之加剧，在建工程“烂尾”，工程款无法回收，工程项目风险尤其是资金回收
风险把控能力成为施工企业实现健康持续发展的关键环节。本文以某公司（以下简称为“公司）为示例就 2019 年至 2023 年建设工程总承
包合同管理，运用实证分析方法，探索资金回收风险发展趋势，从发包人资信、项目融资、销售资金监管、非现金支付、以房抵款五方面
分析主要风险点源，制定风险应对措施，提高施工企业资金回收能力确保企业合法权益。
关键词：建设工程总承包合同管理；资金回收风险；应对措施</p>