<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7198-57</article-id>
      <article-id pub-id-type="publisher-id">8603</article-id>
      <title-group>
        <article-title>论述造价控制在工程招投标阶段的研究与应用</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王 芳 （南京建盛房地产开发有限公司）</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2024</year>
        <month>17</month>
      </pub-date>
      <issue>17</issue>
      <abstract>
        <p>在工程项目的招标阶段，作为建设方（甲方）需要面临多重造价控制挑战，其中包括施工图纸编制质量、工程量清单准确性、材
料及设备市场价格波动，以及不完善合同条款带来的潜在成本风险。研究从甲方的角度，对这些影响招标阶段成本管控的主要问题进行系
统分析，并提出一系列造价控制策略，如完善招标文件、严格审查施工图纸与工程量清单、加强现场调查与市场调研、精细化编制工程预
算参考底价，以及细化合同条款和风险分担机制。通过在招标阶段的科学、严谨管控，甲方可有效减少后续施工阶段的造价风险，提升项
目整体投资效益。
关键词：招标阶段；造价控制；成本风险</p>